The Annova LNG Brownsville Project would bring a liquefied natural gas terminal to the Port of Brownsville. Brownsville was chosen for the project because it offers land availability, location, infrastructure and shipping channel access.

port-of-brownsville-aerial-1216-1000x595-01

LNG is safe, non-toxic and non-corrosive. No natural gas odor will come from the facility as an odorant is only added to methane gas when it is sent to homes and business to help detect leaks. LNG facilities use other safety measures and do not need the odor additive.

The Federal Energy Regulatory Commission (FERC) would need to approve the project before moving forward. Once the FERC authorization order is issued (typically 18 to 24 months after the application is filed), construction could begin about six months later. The project also depends on Annova LNG successfully obtaining all necessary local, state and federal permits; sufficient long-term customer commitments to buy liquefied natural gas from the facility; and broad public support of the project in South Texas. A decision whether to build the facility is expected in 2018.

For information on employment visit www.AnnovaLNG.com or www.ExelonCorp.com.

Project Schedule

infographic-project-schedule-1016-1500x1896-01

Project Diagram

project-diagram_1100x824_01

Annova Zone Map

annova-zone-map_1000x652_01

Learn More

Sign Up for Updates

Receive email updates from Annova LNG about the Brownsville project.

The Port of Brownsville, a deep-water seaport located on the southernmost tip of Texas along the U.S.-Mexico border, opened for business 80 years ago in 1936. This port is the largest land-owning public port authority in the nation with approximately 40,000 acres. The Port of Brownsville has the opportunity to bring a new industry to the region that could provide jobs and an economic boost for decades to come. Exelon Generation, majority shareholder of Annova LNG, is exploring the potential of building a liquefied natural gas (LNG) transfer terminal at the Port of Brownsville.

Annova LNG currently has a lease option on a piece of property that sits on the south side of the 17-mile ship channel, approximately 8 miles inland. Although the ship channel was dredged in the middle of the last century, it was never fully developed. With the growing demand for natural gas in other parts of the world where it doesn’t exist, and with the abundance of it in South Texas, Annova LNG sees an opportunity to make the Port of Brownsville a global energy hub, which could provide a range of economic benefits to the local and regional economy.

If built, Annova LNG would invest nearly $3 billion in construction costs and support an average of 700 on-site jobs monthly over a four-year period. These are jobs that would be filled in the Rio Grande Valley.

Upon completion of the LNG plant, Annova LNG would employ approximately 165 permanent full-time workers to run and manage the plant. The average base salary would be $70,000 per year, with benefits raising total compensation to $110,000.

The economic impact would also help retain and expand other port businesses, as well as provide an indirect boost to other local businesses, such as engineering and design firms and construction subcontractors, suppliers and service providers. Given that 35 percent of residents in Cameron County live below the poverty level, the proposed Annova LNG project would be a much-needed economic boost.

Unlike other proposed LNG plants, Annova LNG would be a mid-scale processing and export facility that would serve a niche market of off-takers who need smaller LNG deliveries.

Exelon Generation and Annova LNG are committed to protecting the safety of Rio Grande Valley residents and the environment of the region. Natural gas is a much cleaner energy source than oil or coal and is used in stoves, hot water heaters and furnaces to heat homes. It is also now increasingly used as a fuel source to generate electricity and alternative-fueled vehicles. LNG is non-flammable, will not explode, and has no odor. In fact, LNG plants have operated for more than 50 years without an incident that affected public safety.

In order to be built, the Annova LNG project must meet standards for public safety and environmental protection established by numerous federal, state and local authorities, including the Federal Energy Regulatory Commission, U.S. Department of Energy, U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Fish and Wildlife Service, Texas Commission on Environmental Quality, Texas Fish and Wildlife Department and Cameron County. In fact, Annova LNG and its majority owner, Exelon, recently made a $40,000 donation to help protect and monitor endangered ocelots in South Texas. The donation was made to the Caesar Kleberg Wildlife Institute at Texas A&M University-Kingsville to help buy GPS tracking collars and other devices that will help monitor and research the ocelot population.